Engineering

The Marquette City Department of Engineering provides design and construction engineering for various water, sewer, drainage, street and other public infrastructure projects throughout the city. The department maintains records and maps of the City and is in the process of mapping all of the City’s infrastructure using Geographic Information Systems (GIS).

The Engineering Department issues and monitors work and activities within the public Right-of-Ways (streets or public easements). Right-of-Way permits are required for all utility work, street work, hauling activities, house moving, parades or other activities that impact the street system. Permit fees are listed below and will be charged accordingly for approved permit applications. For more information please contact the Engineering Department at (906) 228-0440.

Completed Projects

MARAD Grant funded Dead River Dredging Project

CR 550 Bridge Repairs

Front/ Crescent Sewer Extension Project

Sugarloaf Multi-Use Path Extension

PROJECT

PROJECT

Current Projects

Project Title: MQ13-502 Lake Superior Shoreline Restoration

Project Engineer:  Mikael Kilpela, Jim Compton

Inspector:  Dan Salmon

Drawings: https://marquettemi.gov/wp-content/uploads/2022/04/MQ13-502-Lake-Superior-Shoreline-Restoration-Bid-Drawings.pdf

Contractor:  Smith Construction

Start Date:

End Date:  10-12-25

Project Title: MQ25-101 Street Maintenance Project

Scope:  Crack sealing asphalt pavement street and adjusting various manhole covers

Project Engineer:  Kellen Wessels

Inspector:  Jared Kangas

Drawings: https://marquettemi.gov/wp-content/uploads/2025/05/3-SIMP_2025_Overband_Crack_Filling-1.pdf

https://marquettemi.gov/wp-content/uploads/2025/05/4-Overview-Map.pdf

Contractor:  Fahrner Asphalt Sealers LLC

Start Date:  4-14-25

End Date:  9-27-25

Project Title: MQ13-504 Protecting Critical Infrastructure and Improving Efficiency - Coastal Resiliency Project

Scope:  This is the second and final phase of a dredging, beneficial re-use and coastal resiliency project.  This final phase includes the establishment of dune grass and native plantings at the mouth of the Dead River where the river mouth was recently re-routed.

Project Engineer:  Mik Kilpela

Inspector:  Dan Salmon

Drawings:  https://marquettemi.gov/wp-content/uploads/2025/05/MQ13-504-COASTAL-RESILIENCT-BID-SET-1.pdf

Contractor:  G & J Site Solutions

Start Date:  4-14-25

End Date:  9-20-25

Project Title: MQ25-018 Sidewalk Repair and Replacement & Third Street Coal Bunker Rehabilitation Project

Scope:

  • Replace various portions of sidewalk throughout the City of Marquette that are potential trip hazards
  • Place an ADA compliant ramp on the south of the 100 Block of W. Washington Street (South side)
  • Abandon and fill in 3 coal bunkers that are located along the east side of the 3rd Street north of Washington Street

Project Engineer:  Mik Kilpela

Inspector:  Kevin Rautiola

Drawings:  https://marquettemi.gov/wp-content/uploads/2025/05/Sidewalk-Replacement-Overview-Map.pdf

https://marquettemi.gov/wp-content/uploads/2025/05/Sidewalk-Replacement-Map-Booklet.pdf

https://marquettemi.gov/wp-content/uploads/2025/05/BP25-04-Plans-Coal-Bunker-Rehabilitation.pdf

Contractor:  Associated Constructors LLC

Start Date:  4-14-25

End Date:  8-1-25

Project Title: MQ50-276 Tourist Park Day Use Entrance Road Project

Scope:   Construct a new entrance roadway and parking area from CR550 to Tourist Park for day use access.

Project Engineer:  Mikael Kilpela

Inspector:  Dan Salmon

Drawings: https://marquettemi.gov/wp-content/uploads/2025/05/MQ50-276-COMBINED-PLAN-SET.pdf

Contractor:  TBD

Start Date:  TBD

End Date:  TBD

Contact

Office

906-228-0440

Address

1100 Wright St. Marquette, MI 49855