Beginning at 7:00 a.m. on Monday, July 22, 2024, Cross General Contracting will
be closing a single lane of the County Road 550 Dead River Bridge so that repairs and maintenance work can be completed. A temporary traffic signal will be installed to allow vehicles to pass through the construction site. The work is expected to last approximately one week.
The public is urged to take caution and follow all traffic control measures.